Preventive measures for common quality of switchgear installation quality
The handling and lifting of complete sets of equipment should be handled in accordance with the lifting regulations, and the acceptance and storage of complete sets of equipment should be strengthened. The packaging box or packaging of the equipment should not be removed until installation. When installing a complete set of cabinets, a channel steel base should be installed on the concrete floor according to the installation standard.
The base should be leveled with a horizontal ruler. The price of the three-phase AC regulator should be found with a square ruler. Leveling and then leveling to both sides, the price of the three-phase isolation transformer has finally pulled a line on top, localized with a thin iron sheet for leveling and leveling, after leveling, punch holes in the base channel steel and fix it with screws.
Contact Us
Hot Products
-
11KV switchgear metal clad power switchgear MV switchgear panel
KYN28 metal clad switchgear,
Knkong、ABB or Schneider inside
3.6-24KV, three-phase, AC 50/60Hz
Can be equipped with VS1 VD4 3AH5 ZN65A VB2 VCB
Meets IEC standard
Send us your SLD (Single Line Drawing) or requirements ,we design switchgear plan for you2019-06-21 -
33KV switchgear panel, metal-clad MV switchgear power switchgear panel
KYN61 metal-clad medium voltage switchgear,
Knkong、ABB or Schneider inside
40.5KV, three-phase, AC 50/60Hz
Can be equipped with VS1-40.5 VCB
Meets IEC standard
Design switchgear plan as SLD (Single Line Drawing)2019-06-21